I feel like a Champion!!
This week was rain almost all week finished big timber job in KY. Tuesday. Got all equipment moved to the mill. Spent the rest of the work week on maintenance.
Went great, fixed Titus. Repacked grab arm cylinder, leaks on three hydraulic lines. Replumbed back rear end. It has breaks and diffy lock and don’t leak a drop. Fixed bent panels, door strikers, mounted saw and gas can and toolboxes. It’s set up for some real Production.